R & S Services     

   
  Project Examples
 
 
 
  CHILLER PLANT REPLACEMENTS


SERVICES UNDERTAKEN: Detailed design. CDM Role, Craneage, Power Supplies. Equipment Whole Life Cycle Cost Analysis. Installation. Piping. Commissioning and Proving. 10 Machines on 5 sites with a total refrigeration capacity at 6,500 kW

 
 
 

PROCESS AIR CONDITIONING


SERVICES UNDERTAKEN: Design and construction of new Close Control Low Temperature HVAC. Chilled water, BMS, LTHW, Glycol, High Efficiency Filtration, Sanitation, Compressed Air, Gas Services. Hepa Filtration. Power Supplies.



 


 
 

PROCESS PLANT SKIDS

SERVICES UNDERTAKEN: Design. Load analysis. Test water conditioning skids. 2000 kW Steam heating plant. 1000 kW Cooling water system. Steam. Test water. Chilled water.

 
 
   
 

STEAM PLANT

SERVICES UNDERTAKEN: Design. Drawings. Load Analysis. Gas and Fuel Oil Piping. Metering. Phased Change-overs. Insulation. Blowdown. Access Platforms.

 





       
 